Are you looking for information on handling of steel and glass you will find it in our document collection under Documentation.
1. Transport
- Wooden stairs must be transported in covered vehicles.
- Unloading must be done by hand with great care.
- A forklift or equivalent may only be used when the stair parts are loaded on a pallet.
2. Delivery reception
- Check that the number of parcels matches the waybill.
- Feel free to open the packaging and check that the contents are ok, but leave all parts in their respective packages until it is time for assembly.
- Read the Receipt Control document attached to each stair delivery.
- Transport damage and deficiencies in the scope of delivery must be stated on the waybill.
- Ev. hidden faults must be reported before installation, but no later than 7 days after receiving the delivery.
3. Storage before assembly
- Storage next to or on the construction site must take place indoors in a dry, heated and well-ventilated room.
- Humidity and temperature must not deviate from the normal indoor environment.
4. Mounting
- Installation of stairs may only take place when construction moisture has been vented out.
- Packaging must not be removed until assembly is to begin.
- The manufacturer's installation instructions must be followed.
- The supplier is not responsible for damage caused during or after assembly.
- Go through the checklist for installation and complete the Installation report
5. Protection of stairs in building
- During construction, the stairs must be protected against dirt, moisture and mechanical damage.
- The building contractor is responsible for ensuring that damage to installed step guards etc. is rectified immediately and that the stairs are otherwise protected during the construction period.
- Drömtrappor is not responsible for paint damage that occurred where unapproved tape was used when masking or installing step protection.